七年级英语下册导学案:module12westernmusic1内容摘要:
c. There were two __________ called Johann Strauss: a ________ and a _________. The father wrote and played music for a classical dance — __________. His waltzes made him famous all over _____________. Johann Strauss the younger, was even more __________ and ___________ than his father. He wrote ________ 150 waltzes and his most __________ one was The Blue Danube. He wrote it in 1867. Strauss and Mozart were two of the most __________ posers. 二、所给动词的适当形式填空。 1. Tony ___________ (not like) pop music, does he? 2. I like pop. It’s lively and good ________ (dance) to. 3. There were two posers _____ (call) Johann Strauss. 4. Mozart _______(die) in 1791 when he was only 35. 5. He _____ (be) a teacher in 1992. 【学后反思】 :对于本单元的学习,还存在哪些疑惑。 并且请你简单地总结。 【能力提升】 一、根据中文提示完成句子。七年级英语下册导学案:module12westernmusic1
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。