牛津译林版英语九下unit3asiappt课件之三内容摘要:
t square in the world? _______________ 3. Which ceremony can we see there? _________________________________ do the local people like to do there? ______________________________ Back to Beijing It means ‘a gate of heavenly peace’. Yes, it is. We may watch the raising of the national flag. They like to take a walk and fly kites there. Summer Palace Summer Palace is located in the ___________ Beijing. It is a ____________ garden. The emperors used to spend _________ there. It is still very beautiful and attractive for the ______and a _______________________ __________________ __________________ Back to Beijing northwest Chinesestyle summer hill manmade lake, with bridges, pagodas and halls all over the area. Back to Beijing The Great Wall The Great Wall runs _______________________, and it was built with ______ and_______. The Great Wall was used to ________the country. It is one of the seven ________ of world. It is very tiring to reach the top of the Great Wall。牛津译林版英语九下unit3asiappt课件之三
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。