牛津上海版深圳四下unit7myday第二课时ppt课件1内容摘要:

work. They catch a lot of mice. Presentation Min and Mog go to bed at six o’clock in the morning. They are tired. Discussion Read the story again and answer the questions. time do Min and Mog get up ? At seven o’clock in the evening. time do Min and Mog have dinner ? At half past seven.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。