if或whether引导的宾语从句内容摘要:
her后可直接接 or not,而 if 不可以。 例如: I want to know whether or not it39。 s good news. 我想知道是否是好消息。 (3) 在介词后,只能用 whether。 例如: His father is worried about whether he will lose his work. 他的父亲担心是否会失去工作。 (4) 宾语从句放在句首表示强调时,只能用 whether。 例如: Whether they can finish the work on time is still a problem. 他们是否能准时完成这项工作还是个问题。 (5) 用 if 会引起歧义时,只用 whether。 例如: Could you tell me if you know the answer? 这句话有两种意思:“你能告诉我是否知道答案吗。 ”或“如果你知道答案,请告诉我,好吗。 ”。 如用 whether可避免歧义。 (6) 如果主句已有一个 if 引导的条件句,为。if或whether引导的宾语从句
相关推荐
Lead them through a question and answer drill like This: T: What’s the weather like today? Ss: It’s sunny and hot. T: Yes, it’s sunny and hot. In summer it is always hot. Summer, summer. Follow me
been to the other countries? What do you know about Britain\American? (Ask students to speak out as many as they can) ’s the difference between the UK and the USA?(The teacher can show the Ss some
__________________________________________ 2. Sally said, “You shouldn’t smoke in this room, Gee.” (forbid) → _______________________________________________________ 3. “It was me. I took the money,”
利用平抛运动规律 解决实际问题的思路建立 【学习难点】 平抛运动的速度、位移方向在解题时的应用 【方法指导】 自主 学习 、交流讨论、自主归纳 、练习 【自主探究】 1. 平抛运动物体的速度方向与位移方向的关系 【 合作探究 】 1. 利用平抛运动的规律求解 【例 1】 物体以 v0=10m/s 的速度水平抛出,在抛出 2s 内物体位移是多大。 第 2s末的速度是多少 ?前