外研版中考英语八下modules6-8复习课件内容摘要:

:修饰词不同 (1)all可以修饰各类名词 , 且限定词要放在 all之后; whole只能修饰具有整体意义的单数名词 , 且限定词要放在 whole之前。 (2)whole不能直接修饰可数名词复数 , 但是若可数名词复数前有具体的数量词时 , 则可以用 whole。 答案: ① D ② two whole 5. as if 仿佛;好像 ◆ During the night, I heard a loud noise, as if someone was laughing. 夜间 , 我听到很大的声音 , 仿佛有人在笑。 ① Mr. Li always speaks _______ he knew everything. A. if B. even if C. as if D. even though ② 她看起来好像年轻了十岁。 She _______ _______ _______ she were ten years younger. ③ The Browns decided to buy the large apartment _______ they weren’t rich. A. in fact B. as if C. even though D. after all as if =as though 似乎,好像 ① 在 look, seem 等系动词后引导表语从句 ② 引导方式状语从句 , 多用虚拟语气表示非真实的情况 even if =even though 即使,尽管 引导让步状语从句 ① even if的从句中含有强烈的假定性 ② even though则多以从句的内容为前提 【 自主归纳 】 as if/even if的用法辨析 答案: ① C ② looks as if ③ C 6. as soon as 一 „„ 就 „„ ◆ He will meet us as soon as he es back tomorrow. 明天他一回来就会见我们。 ① (2020大庆中考 )—When will you e to Daqing? —I will call you _______ I arrive. A. till B. while C. as quickly as D. as soon as ② If there is any change to the plan, I will tell you ____________ (尽可能快地 ). ③ (2020宜宾中考 )我一到杭州就给你打电话。 I will call you as _______ as I _______ in Hangzhou. 【 自主归纳 】 as soon as的用法 (1)as soon as引导时间状语从句,如果主句是一般将来时,从句要用 __________时。 (2)as soon as ________ =as soon as one can/could,意为“尽可能快地”。 (3)其他的时间连词,如 when, before, after, until等都适用“ _________”原则。 答案: ① D ② as soon as possible ③ soon。 arrive 一般现在 possible 主将从现 7. What does the man think of the music? 这个人认为音乐怎么样。 ① ——你认为中国的四大名著怎么样 ? ——我非常喜欢。 — _______ _______ _______ _______ _______ the four classics (名著 )of China? —I like them very much. ② What does your father think of the talk shows hosted by Zhou Libo? (改为同义句 ) _______ _______ your father _______ the talk shows hosted by Zhou Libo? 【 自主归纳 】 What do you think of. . . ? 句型两考点 (1)基本用法:此句型用来询问对方对某事的看法,也可以说“ _________________”。 当然对这样的问题不能简单地用“ yes”或“ no”来回答,而要具体说明理由。 (2)回答方式: ① I like. . . very much. ② . . . is/are very great. ③ I can’t stand it/them. ④ It’s/They’re interesting/. . . 答案: ① What do you think of ② How does; like How do you like. . . 8. And while we’re staying with them, we’re going to spend a few days in Qingdao. 在与他们待在一起的时候 , 我们将要在青岛度过几天的时光。 ① (2020北海中考 )While I _______ TV, the bell rang. A. watch B. watched C. am watching D. was watching ② (2020齐齐哈尔中考 )Jack likes reading a newspaper _______ he is having breakfast. A. while B. and C. because ③ _______ I went into the classroom, Sally was listening to pop music. A. Wh。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。