外研版中考英语九上modules10-12复习课件内容摘要:

closer to each other. ② (2020扬州中考 ) 谢谢你把字典借给我。 ______________________________________________________ thanks to 意为“幸亏,由于”,其后跟名词或代词,作原因状语,通常可以与 __________互换 thanks for 意为“因 „„ 感谢”,其中 for强调为何而感谢,其后接名词、代词或 v. ____形式 【 自主归纳 】 thanks to和 thanks for辨析 答案: ① Thanks to ② Thanks for lending me the dictionary. because of ing 5. too many /too much太多 ◆ There are too many people and there is not enough space, and there is too much traffic, noise and pollution. 人口太多 , 空间不够 , 而且车辆 、 噪音以及污染过多。 ① There’s _______ noise here. I think we need a quieter place to study. A. too few B. too much C. much too D. too little ② 我不想邀请太多的朋友来我的生日晚会。 I don’t want to invite _______ _______ friends to my birthday party . too many 其后须接可数名词的复数形式。 如 too many students 太多的学生 too much 其后须接不可数名词。 如 too much food 太多的食物 much too much too表示程度 , 修饰形容词或副词 , 如 much too noisy太吵了 【 自主归纳 】 too many/too much/much too辨析 【 一言巧辨异 】 He ate _________ food and he was _________ full. 他吃了太多东西,他太饱了。 答案: ① B ② too many too much much too 6. Along with the crowds, the smoke, and the transport problems. 还有人口 、 烟雾以及交通问题。 ① There was a card together with the flowers. (改为同义句 ) There was a card _______ _______ the flowers. ② The woman, along with her three children _______ lost in the flood last week. A. is B. was C. are D. were 【 自主归纳 】 along with的用法 (1)along with意为“连同,与 „„ 一起”。 相当于 ____________。 (2)along with作定语修饰主语时,定语往往前置,句子的谓语动词只和主语保持一致。 答案: ① along with ② B together with Ⅰ . 根据句意及汉语提示完成单词 1. (2020毕节中考 )It’s ten _______ (分钟 ) walk. 2. (2020南充中考 )He spends more than an hour _______ (锻炼 ) every day. 答案: 1. minutes’ 2. exercising 3. (2020 包头中考 )Great __________ (进步 )has been made in the field of medicine. 4. (2020盐城中考 )The roads are being more and more __________ (拥挤的 )because of too much traffic. 5. (2020 包头中考 )Our knowledge of the universe is ___________ (增长 )all the time. 答案: 3. pr。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。