外研版中考英语第47讲语法填空课件内容摘要:

matter what setbacks we meet, we should face them bravely and manage to overe them. (二 ) Late in the afternoon, the boys put up their tent in the middle of a soon as this _ was_done _(do), they cooked a meal over an open were all hungry and the food smelled _ good _ (well).After a delicious meal, they told stories and sang (sing) songs by the campfire. But some time later it began to_rain/raining (rain). The boys felt tired so they put out the fire and got into their sleeping (sleep) bags were warm and fortable, so they all slept the middle of the night, two boys woke/waked (wake) up and began tent was full of water。 They all leapt out of their sleeping bags and hurried was raining heavily (heavy) and they found that a stream had formed in the stream wound its way across the field and then flowed right under their tent! (三 ) I still remember that day, with a vivid went (go) to a poor family with my friend by I met a little girl who loved music very much, especially played a lot of music for us.The sound was __ so __ wonderful that I lost myself in her perfect performance _(perform). A few days later, I heard __ from __ the girl, with her flute.“ ...I have to work hard for m。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。