外研版中考英语第25讲九年级下册modules5-6课件内容摘要:

ery 王很残暴。 【 拓展精析 】 It is/was thought+ that(从句 )表示 “ 有人认为 „„”。 常见的类似的句型有: It is/was said that...据说 „„ ; It is/was reported that...据报道 „„ 【 活学活用 】 (1)It __D__ reported that more and more people ________ to this city in the past three years. A. is; moving B. is; move C. was; moving D. was; moved 2. We will do anything we can to help 尽力帮你的。 【 典例在线 】 You should do anything you can to help 尽力帮助他人。 I will do everything I can to teach 来教你。 【 拓展精析 】 表示 “ 某人尽力做某事 ” 的句型常有: t r y / do one 39。 s bes t to do s t h.do w hat s b. ca n to do s t h.do any t hi ng/ e v er y t hi ng s b. c an to do s t h. 【 活学活用 】 (2)We must do everything we can __C__ waste water from running into rivers. A. keep B. kept C. to keep D. keeping 1. need, require 【 典例在线 】 Parents also need to pay attention to children39。 s thoughts. 父母也需要注意孩子们的思想。 In the past, people39。 s job required more physical effort. 过去 , 人们的工作需要更多的体力。 【 拓展精析 】 二者都有 “ 需要 ” 的意思。 need当实义动词用时 , 其后可以接名词、代词、动词不定式或动词的 ing形式作宾语。 sb. need to do “ 某人需要做某事 ” , sth. need doing相当于 sth. need to be done, 意思为 “ 某事需要 (被 )做”。 need也可用作情态动词 , 常用于否定句和疑问句中。 needn39。 t意思是 “ 不必 ”。 相当于 not have to, 可以用来对以 must开头的一般疑问句作否定回答。 require有 “ 要求 , 需要 ” 的意思 , require sb. to do 为 “ 要求某人做某事 ”。 require后接不定式要用被动形式, 即 require to be done, 相当于 require doing “需要做某事。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。