冀教版初中英语八年级上册单元测试ppt版3内容摘要:

g C. cake D. fish 【 解析 】 选 C。 由于是冠词 a, 所以排除 A、 B项;因为是 “ 儿童节 , 孩子们的节日 ” , 所以不会是 “ 鱼 ” 而是 “ 蛋糕 ”。 所以选 C。 9. A. All us B. All of us C. All of we D. All we 【 解析 】 选 B。 句意:我们大家都玩得很高兴。 表示 “ 我们都 ” 可用 all of us或 we all, 所以只有 B项正确。 10. A. How B. What an C. How an D. What 【 解析 】 选 A。 感叹句的形式有两种: How+adj. /adv. +(主语+谓语 ) ; What+(a/an)+adj. +n. +(主语 +谓语 )。 所以选 A。 Ⅳ . 阅读理解 ( 10分 ) It was Mary’s birthday. She received a letter from her uncle who was a farmer. “Dear Mary, ” the letter said, “Happy birthday. I am sending you some chickens. They will arrive tomorrow. I hope you like them. Best wishes, Uncle John. ” Mary was very pleased. She liked eating eggs and she liked eating chicken. “I can keep the chickens for their eggs or eat them. ”she thought. When the chickens arrived the next day, they were in a box. Mary was very excited. She took the box off the back of the truck and began to carry it into her garden. However, the box of the chickens was heavy and she dropped it. The box fell to the ground and broke. The chickens all ran out. They ran everywhere—into neighbours’ gardens, onto the road. . . Mary spent(花费 ) several hours trying to find them and take them back to her garden. A few days later her uncle came to visit her. “Did the chickens arrive safely(安全 )? ”He asked Mary. “Yes, Uncle John. ”Mary said. “But I had a lot of trouble(麻烦 ) with them. I dropped the box. It broke open and the chickens ran everywhere. I spent the whole morning looking for them. ”“Did you find them all? ”her uncle asked. “I hope so, ”Mary answered. “I caught eleven of them. ”“That’s interesting, ”her uncle said with a smile. “Because I only sent you six. ” 根据短文内容 , 判断下列句子正 ( T) 误 ( F)。 1. Mary’s uncle sent her some chickens. ( ) 2. The chickens arrived on Mary’s birthday. ( ) 3. Mary dropped the box and the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。