冀教版九上unit6accidents(lesson41-42)ppt练习课件内容摘要:

1 a few minutes the trees were on fire. A truck driver saw the 2 when he was on his way to Stanton. As soon as he 3 the town he told the police about it. Soon firefighters were rushing westwards. When they reached the fire, they saw it was very 4 . A west wind was carrying the fire towards Stanton and the firefighters could not 5 it. Then, one of the firefighters 6 a message back to the town by radio. The chief fire officer and hundreds of people 7 to a place about a mile of the town. There they used dynamite(炸药 )to blow down the trees and to clear a wide path through the forest. 8 the fire reached the path, it began to die down because there was 9 left to burn. After several hours they managed to 10 the fire and save the town. 1. A. During B. Before C. For D. Within 2. A. cigarette B. fire C. car D. forest 3. A. reached B. left C. lived D. found 4. A. safe B. small C. big D. beautiful 5. A. stop。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。