北师大版五年级上册英语unit1ann’sdream(1)内容摘要:

night these days. Have them talk about their dreams with questions of “Were you in the dream? What were you in the dream?” Have the children open their books at page 2and 3. Tell them they are going to read about Ann’s dream. Ask the children to look at the story and then have them describe what liiustrated in each picture and what the main plot is. Have the children listen to the tape , checking children’。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。