北师大版一年级上册英语unit2aboutme之一内容摘要:
ary the exercise by sometimes saying only the mands, without Please. 2. Listen and practice (1) Have the children open their books and draw their attention to the photograph of the cat. Point to the picture on the page and say, “This is a cat.” (2) Play the tape, pointing to the photograph matching the word. (3) Now replay the tape and have children touch the photograph as they listen (4) Play the tape one more time and have children listen and say, “Cat” aloud. (5) Repeat the procedure with the word “Crocodile, duck, dog.” 4. Match and color (1) Hold up the word cards (cat, crocodile, duck, dog), ask children to say these words in English. (2) Have children open their books and look at the pictures. (3) Direct children’s attention to the English words and read out aloud the words. (4) Now have children match the words with the pictures of the things. (5) Ask children to color each picture. 教学后记 : The fourth period 1. Revision. (1) Begin the class with students saying the rhyme loudly, encouraging them to clop to keep the rhythm. (2) Say the following mands and have children listen to and follow them. (3) Review the vocabulary and structures for this Unit with the Poster, or have children look at the picture on page 10. 2. Make the picture (1) Have children open their books and look at the two halves of the page. Point to the word girl , model it and have children repeat after you. Do the same for the word boy. (2) Explain that children are going to draw pictures of a girl and a boy, color them with crayons, and decorate them with yarn, string, scraps of cloth. (3)Hand out scissors, glue, crayons, and the craft materials. Set enough time for children to make their pictures and then have them share their art with the rest of the class. (4) If there is not enough time, ask children to finish the rest of the work a。北师大版一年级上册英语unit2aboutme之一
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。