初二英语导学案unit1sectionb内容摘要:

mall, people are ___________(shop). 3. My mother likes _________________(read). 4. When do you want ____________(see) a movie? 5. He can ___________(dance) and ______(sing) 6. Look! What ____ they ________(do)? They ________(talk) about the movie. 7. Where _____he______(e) from? He ________(e) from Japan. 初二英语导学案 unit1SectionB( 3a4) 执笔:樊洪霞 课型:新授 时间: 2020096 审核: 一 、 学习目标: words: happy, apartment, wait, stop, toy, shopping, mall, pool, camera, bird talk about what you are doing at school. 二、 学习重点: 理解现在进行时这一时态;会用其描述活动。 三、 学习难点: 用现在进行时来描述一幅综合图画。 四、 课前准备 1. Read the letter from Mike to his pen pal. Underline the activities and circle the places. Then read the letter again and number the photos1— 4 2. Look at 3b’s picture, and fill in the blanks. Check the answer in groups. 3. Bring one of your own pictures or draw a picture, then write about them. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。