初二英语unit5单元复习练习题内容摘要:

s D. wants 25. ________does Jim go to the park? once a week. A. How long B. How soon C. How often D. When 26. She often drinks milk and porridge, she thinks they’re good ______her healthy. A. at B. for C. to D. as 27. How is your sister? oh, she is not feeling_________. A. good B. well C. health D. early 28. I can’t go out with you. I have________work to do. A. too much B. much too C. too many D. many too 29. We are all very tired and thirsty and we must stop__________. A. to play B. playing C. not to play D. not playing 30. _________his grade, he can’t tell it to you. A. As for B. As of C. About for D. About to 二. 完型填空 Mike doesn’t feel very well these days. He has a stomachache. Today is Sunday. His mother____1____him to see a doctor. Before seeing the doctor, they_____2____wait for some time____3____the nurse____4___ white dress says to them, “please e in. it’s your turn!”(轮着你了 ) Mike looks very nervous ____5_____he es into the doctor’s room. “Now tell me what’s wrong ____6___you?” the doctor asks “I feel terrible. I have a ____7_____stomachache,” says Mike. “Well, let me have a _____8_____.”Says the doctor kindly. After____9_____his stomach, the doctor says “nothing__110___. Take the medicine。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。