初二英语9月讲评内容摘要:

⑵ 动词填空注意句子的时态 ⑶ 完形填空注意对整篇文章的理解 ⑷ 翻译句子注意句子的结构 进行补偿性训练。 补偿性训练 一、 单项选择 1. Tim and Jim _______ a big bedroom. A. are having B. have C. has D. are wanting 2.- Mum, I ______ my socks. But I can’t ______ them. - Are they in the washroom. A. am looking, find B. am looking, see C. am looking for, find D. am looking at, see 3. — Isn’t your father _____ the football game on TV? — No, he _______. A. see, does B. seeing, isn’t C. watch, does D. watching, isn’t 4. What is Jim doing?。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。