冀教版四年级上unit3lesson17thefarm2篇内容摘要:

幅有关农场风景的大图。 Introduce field, mud and pond. (Read the a few times with the class.) Story “Never Ride a Pig in the Mud.” Prepare to read. Discuss the picture for the story in the storybook. Ask for volunteers to point out things they can name in English. What do the students think will happen in this story? Read the story. Play the audiotape of the story as the students follow in their storybooks. Stop the audiotape after the first half of the story. Ask the students what they think will happen next. Play the audiotape to the end of the story. Discuss the story Ask for volunteers to retell the story in Chinese. Let each volunteer explain one picture. Play。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。