外研版英语八下module2unit3languageinuseppt课件2内容摘要:
. Smith asked Miss Gao if / whether she worked in a school. The farmer asked his son if / whether he could grow fruit. The teacher asked if / whether the earth turns around the sun. 宾语从句三要素: 语序 、 时态 、 引导词” • 宾语从句的语序 1). 宾语从句的语序是陈述语序 ,即“连接词 +主语 +谓语+其它成分”。 而不是疑问句的倒装结构。 Can you tell me where will we go?( ╳ ) Can you tell me where we will go?( √) 2). 陈述句变为宾语从句时 ,要注意人称和时态的变化 ,语序不变。 eg. She said, “I will leave a message on the desk.” → She said she would leave a message on the desk. 3)一般疑问句和特殊疑问句变为宾语从句时 ,也要注意人称和时态的变化 ,后面接陈述语序。 eg. “Where are the tickets?” I asked him. → I asked him where the tickets • 宾语从句的时态 宾语从句中谓语动词的时态,常常受到主句谓语时态的制约,此为时态呼应。 1)如果主句谓语是一般现在时或将来时,从句谓语的时态不受限制; 2)如果主句谓语的时态是一般过去时,从句一般要随着改为相应的过去时态(一般过去时、过去进行时、过去将来时、过去完成时)。 eg. I thought ( that) you are free today. ( ╳ ) I thought ( that) you would be free today. ( √) 3)【 注意 】 当宾语从句叙述的是客观真理时,不管主句谓语的时态如何,从句都用一般现在时。 eg. The teacher told us ( that) the earth moves around the sun. • 宾语从句的连接词 1.连词 that,只起连接作用,在从句中不作句子成分,也无词汇意义,在口语中常被省略。 eg. He knew ( that) he should work hard. 2.连词 if 、 whether,它们起连接作用,在从句中不作句子成分,作“是否”解,在口语中多用 if。 eg. Tom don39。 t know if/whether his grandpa liked the present. He asked me whether or not I was ing. 一般情况下, if 和 whether可以互换,但以下 3种情况只能用w。外研版英语八下module2unit3languageinuseppt课件2
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。