unit7teenagersshouldbeallowedtochoosetheirownclothes第1课时学案内容摘要:

ne 一般过去时: was / were + done 一般将来时: shall / will + be done 一般过去将来时: should / would + be done 现在进行时: am / is / are + being + done 过去进行时: was / were + being + done 现在完成时: have / has + been + done 过去完成时: had + been + done 将来完成时: shall / will + have been + done 过去将来完成时: should / would + have been + done 含情态动词时其构成 : 情态动词 + be + done [注 ]被动语态没有将来进行时和过去将来进行时。 【学法引领】 完成一个任务: Ask some students to tal。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。