20xx秋苏教译林版英语四年级上册unit8dolls第一课时内容摘要:

s/nose/mouth/hair. Ss: Eyes. 2. Draw two different dolls on the blackboard. Then ask the students to pare T: Here are two dolls. This is a girl doll. Her hair is long. Her eyes are big. Her nose and mouth are small. That’ s a boy doll. His hair is short. His eyes and nose are small. His mouth is big. His ears are big, too. 3. Teacher acts, the students guess 老师做一些形容词的动作,学生分组 PK 猜测比赛。 4. Watch the cartoon and finish the form hair eyes nose mouth Ears Girl doll Long big small small Boy doll short small small Big big 5. According to the form to say t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。