20xx春鲁教版英语七下unit8i’llhelptocleanupthecityparksperiod1word导学案内容摘要:

the bed clean the living room work on 二、合作研讨 : 词义辨析:写出划线部分的意思 1) dish: ① I often do the dishes after meals. ② I’d like two dishes. One is fi sh, and the other one is chicken. 2) ride: ① I often ride my bike to school. ② Steve, could you give me a ride? 3)have to & must ① I have to look after my mother because sh e is ill.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。