4560 CMOS BCD全加器内容摘要:

1、0065in of is s is no dc 8 owow( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 1253 1 3 1 3 10 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 1 0 0 0 0 10 1 0 0 0 0 1 1 0 0 0 1 1 10 1 0 0 0 0 1 1 1 0 1 0 0 00 1 1 1 0 1 0 0 0 1 0 0 0 10 1 1 1 0 1 0 0 1 1 0 0 1 01 0 0 0 0 1 0 1 0 1 2、0 0 1 10 1 1 0 1 0 0 0 0 1 0 1 0 01 0 0 1 1 0 0 1 1 1 1 0 0 1* to to to or to of to be to ( be to an be 19951/9400800051199420 55 25C 48D 51315141234561211109655525 0” ” 0 0” O= 4.5 (9.0 (13.5 ” O= 0.5 (1.0 (1.5 0) 150300600(50 pF on (A/f + (A/f + (A/f + is to be is as an of Cs *5To at 0 T(= 0 + (50) A ( V = (in f in is k = (50 25 (1.5 ns/25 (n。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。