40181 CMOS 4位算术逻辑单元内容摘要:
9894N 6 F 6 B 00 T 20V 10V, 5V F 100T 18V 5F 3A, ”F ”B”4or is of 6 on 6 of M = or M =S2,3) or in in be or at , by (s on A n+4is is of in is = B, a is in n n+4by in I. is to C 14581 0.5 20 0.5 18 0.5 10 55 125405C 65 150 to is a of at or in is to 2 55 125405C2 0 = H) = L, ) = H) = L, )0 0 0 0 A A A 0 1 B A+ B A + +B B A+ 1 1 0 1 0 0 A+ B A A + B) 0 1 B AB A + B) B (A + B) B A A B A 0 1 1 1 A + B A + B B 1 0 0 0 A + B) A + B A B A A B A 1 0 1 0 B AB A + B) B (A + B) 1 1 A + B A + B B 1 1 0 0 A A 1 1 0 1 B A + B (A + B) 1 1 1 0 B A + B (A + B) 1111 A A A as s n in is as : 01 01 A1 = 2CF4。40181 CMOS 4位算术逻辑单元
相关推荐
00830065to is on on dc 8 owow (0.5 DC 0.5 DC 1050065 1508260to P ” 7.0 0095C 5o 125L” 12 0095C 00o 125to to or to of to be to ( be to an be 19951/9420 55 25C 48D 51 245 1 6 523 4 710 9 550” “1” 0 0”
989F 100 T 2010V, 5V F 100T 18V 5F 3A, ”F ”B”6or is a of is to as in in up to a of LUs. s be to of up of G) P) is to (1(, , 1, 14, 5 , 2, 15, 6 ,12, 11, 9 0 0.5 20 0.5 18 0.5 10 55 125405C 65 150 to
is a in is 0 of an to up is to is 4 a6 4V12V V18ow 4 0 00n ow V S 089971999 )1522)(65C 150C 7015010 +26060 +21515 +220of 37C/107C/O 35C/O 172C/210C/56C/, 2)25 12 18S=6V, 04S= 6V, 8, 10% 250 325 S= 9V
1、- 1 C 机通讯目 录第1节 引 言 . 单片机串行口与. 系统主要功能 .单片机串行口与. 系统的硬件构成 . 设计说明 . 系统电路图 . 8031单片机及其引脚说明 . 显示接口8279的功能及其引脚说明 . 数据格式和数据的协议 .统软件设计 . 系统主程序框架图 . 系统主要程序 .束语 . 节 引 言单片机应用中,串口通信是不可缺少的部分。
1、 - 1 - 电压控制 荡器 (A 题 ) 作者: 敏、 玉 、王龚亚孙飞军(空 雷达学院)军 赛前辅导教员: 有 、 振 、 振云、刘士平邓训韩铎陈 文稿整理辅导教员: 郭云林 摘 要 该电压控制 荡器以 89 片为核心,采用锁相频率合成技术产生高稳定度的正弦信号,设计了一种 高性能的数模混合自动稳幅电路,包括峰值检波、 A/D 转换、单片机控制等