LM386 低压音频小功率放大器内容摘要:

is a in is 0 of an to up is to is 4 a6 4V12V V18ow 4 0 00n ow V S 089971999 )1522)(65C 150C 7015010 +26060 +21515 +220of 37C/107C/O 35C/O 172C/210C/56C/, 2)25 12 18S=6V, 04S= 6V, 8, 10% 250 325 S= 9V, 8, 10% 500 700 S= 16V, 32, 10% 700 1000 6V, f = 1 6 F 46 6V, 00 6V, 8,125 f = 1 6V, f = 1 10 F 50 50 S=6V, 50 : to : to is do C C is no is a of : in 5C, be on a 150C ) a 0C/W to ) a 70C/W a 1) k 0 (26 If a , k go up 00 (46 If a is in be to 000. be by a to be in to we by is a (5 k dB R 15 = 10 k if is If as as。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。