4530 CMOS 双5输入优势逻辑门内容摘要:

005300770071is in a in by of ) as dc 8 owow(0.5 DC 0.5 DC 1050065 1508260to P ” 7.0 0095C 5o 125L” 12 0095C 00o 125 B C D E W of 0”1 0of 1”1 1to to or to of to be to ( be to an be 19951/9420 55 25C 48D 510 0 10 1 01 0 01 1 16Z = = ( = = ( = = (* a 1” if or 1”0017 0017 55525 0” “1” 0 0” O= 4.5 9.0 13.5 1” O= 0.5 1.0 1.5 0) (50 pF on (A/f + (A/f + (A/f + is to be is as an of Cs *5 To at 0 T(= 0 + (50) A ( V = (in f in is k =。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。