4561 CMOS “9”补码电路内容摘要:

0067s is a to to CD A 8421 to 20, 21, 22, 23). If is CD at to be or an to be If is s of is at Z), of is to CD in dc 8 ( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 1251 3 00 0 12 4 10 1 0 2 2 X 0 0 0 0 t 19951/94to or be to to be be to be 32 55 25C 46D 51 55525 0” ” 0 0” O= 4.5 (9.0 (13.5 ” O= 0.5 (1.0 (1.5 0) 150300600(50 pF on (A/f + (A/f + (A/f + is to be is as an of Cs *5To at 0 T(= 0 + (50) A ( V = (in f in is k = (50 25 (1.5 ns/25 tT。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。