4584 CMOS 六施密特触发器内容摘要:

00830084is in a or is be in of dc 8 owowe in( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 125)to to or to of to be to ( be to an be 19951/9432 55 25C 46D 51455525 0” 0 “1” 0) (50 pF on (A/f + (A/f + (A/f + H Tis to be is as an of Cs *5To at 0 T(= 0 + (50) A ( V = (in f in is k = as T+VT50 25 100504020010080100504020010080125504025010080is to be is as an of Cs .。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。