4051 CMOS 8选1双向模拟开关内容摘要:
983999 1999 of up 5be by 15V. 5V, 0V 5V, 5V 5V be by 5V. of of a 1” is at is a A, B, , an to be N” to is a A , an of on is a A, B, , an of a of in a of 15V, 580 ( 5 1510 10 15V ( 3 15V) to 5 15V) 5 ( 15 W ( 10on by X” to 16A 16 6 16E 16 16A 16 16D 16 I, 16E 16 16A 16 16D 16 I, 16E 16 IP ont B A 0 0 0 0X, 0Y 0 1 1 1X, 1Y , b 1 1 3 3X, 3Y 0 0 4 bx b b * * () : “of be to be at ()18 65C 15000 00 (10 260+5 15 0V 40C 850C +25+85, B, C DD。4051 CMOS 8选1双向模拟开关
相关推荐
7to C 21 999of a 5 an to a 7in a is in or to is at if is is is be a if is is on to in a a, b, c, d, e, f, g) in a . go on 20V C 10V “100% 0V 5V, 10V 5V o. 13B, “B” 60, 60, 12 301992in a in an an be
1、电子设计应用 通过红外光在空中的传播来传输数据, 它由红外发射器和红外接收器来完成。 在发射端, 发送的数字信号经过适当的调制编码后, 送入电光变换电路, 经红外发射管转变为红外光脉冲发射到空中 ; 在接收端, 红外接收器对接收到的红外光脉冲进行光电变换, 解调译码后恢复出原信号。 红外通讯作为一种数据传输手段, 可以在很多场合应用, 如家电产品、 娱乐设施的红外遥控, 水、电、
D is - or on is by e 0; at is e 1, a e 0 e 1), at at an 5DD(an 4 4 100234. S. )to 00 00 10 260)30)V 1 30 0V 2 60 5V 4 120 V 0V 5V V 0V 0 5V 5 V, 0V, V V 5V, V, 0V, V V 5V, V() V, 0V, .9 5V, .4 V() 5V
表示十分之几、百 分之几、千分之几„„的数,叫做小数。 小数的计数单位有 0。 1, , „„每相邻两个计数单位间的进率是“ 10”。 5. 数 位 顺 序 表 6. 小结: 7. 熟记: (三)教学( 71 页)例 读一读。 读作:( ) 读作:( ) 读作:( ) 读作:( ) 1. 独立完成: 2. 小组交流: 3. 全班议一议: 4. 课堂小结: 读小数时要注意什么。 整数部分( )
1、1简易智能电动车 息科学与工程学院 李奎星、姚珊、亓明勇设计报告目录一、 方案比较、选择与论证系统总体方案设计1、 系统总体结构设计及说明2、 系统硬件详细设计、理论分析和计算、详细电路图3、 系统软件功能设计、理论分析和计算、各程序框图4、 软硬件分别调试、联合调试测试仪器与测试试验方法2开发、实验及测试仪器测试数据及测试结果分析计算3五、 特色与创新点讨论、设计总结3六、 附录(操作说明
小数表示。 ③在上面的基础上抽象、概括出小数的意义。 使学生明确:分母是 100、 1000„„的分数可以用小数表示。 最后教材说明小数的计数单位,单位间的进率由学生自己填出。 2. 小数的读法和写法。 ( 1)小数数位顺序表的整理。 由三个具体的不同位数的小数,说明小数由整数部分、小数点、小数部分构成;然后说明小数各数位上的数