2000APR25 BD PD AN内容摘要:

998 1/6is a 120 75 00 is on a is a WM a 620V/16 to an up of is an is It a a be in a 20W 0W a a of a a to of of is in . is of 9 10 .2 20 .7 .7 7 .2 .1 : of 20 375 V +/- 5%6 1A) 250 mV 70% 0000It on on If in is 3 8 100 (400V) 2 70 200 000 7 .9 D 2 1C C 1 1400 1 : 12T (2T (V op)3 W 0P 5uH - - a of be - To be as MC by a by on o to a of in or of in of .). In as . C be 1, 2 a to be to of *1087615#62 3 (15 2 (7 1 (62 : 66 * 43 5/6: AC 5 AC 65 0 00 0 o 65 400 p/2 7DC DC 75 MS MS 85 2 2 4 .9 nFStandar。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。