溢华深圳电子厂标识及可追溯性程序文件(编辑修改稿)内容摘要:

生效日期 (Effective date) 20xx/10/08 标识及可追溯性程序 Identification and Traceability Procedure 修订 (Revision) 0 次 页次 (Page) 2/3页 (2 Of 3 Pages) As for the nonconforming products to be used as waovie after application, IQC shall remove the original nonconformance identification. After IQC affixes the seal of UAI to relevant identification of product, Warehouse Dept. shall move such kind of materials from the original nonconformance area to acceptable product area. 凡退货物品,在其外 装上均须标示“退货品”字样,并将其放置于退货品区。 The outer package of all goods returned shall be marked with Returned Goods and they shall be put in the returned goods area. 对复检合格的物品,用相应的合格印章或合格标签对其进行标示。 The articles that pass reinspection shall be identified with corresponding seal or label of conformance. 半成品的标识 Identification of semifinished products 对生产过程中的产品,用《马达厂外包装批次卡》及《马达流程卡》进行标识,其中《马达厂外包装批次卡》保存到下工序确认合格时,《马达流程卡》随产品流至客户处。 The products in production process shall be identified with Outer Packing Batch Card of Motor Factory and Motor Flow Card, Outer Packing Batch Card of Motor Factory shall be retained until the confirmation of conformance at the next process. Motor Flow Card shall be sent。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。