20xx春牛津译林版英语七下unit6outdoorfunreading1word导学案内容摘要:

( )4. Do you know the girl ________ a white dress. A. on B. with C. in D. from ( ) found a key _____ the door on a small table. A. in B. with C. to D. of ( ) carefully! Don’ t look ________ the window. A. at from B. out of C. at through D. out from ( )7. A car ______ the old tree last night. A. hitted B. hit C. hits D. was hitting ( )8. Did you hear somebody _______ in the next room yeste rday evening? A. sing B. sang C. singing D. to sing ( )9. ________ a book in the library, enter a key word into the puter. find C. To write D. Write ( )10. Yang Liwei, a famou s astronaut _______ to Foshan in March, 2020. A. es B. came C. was ing D. e 二. 用所给词的适当形式填空。 1. My sister is afraid of _______ (stay) at home alone. 2. What _______ (happen) to Alice just now? 3. Thank you for _______ (tell) me the story. 4. I found it interesting ________ (raise) a rabbit. 5. Miss Yang took a watch out of ______ (she) pocket and looked at the time. 6. I will go to the library _______ (read) the book called Alice in Wonderland. 7. She looked up and saw a waiter in a white coat _______ (pass)。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。