外研版高中英语选修6module3interpersonalrelationships--friendship之六内容摘要:

未接受Robert的建议。 regret doing “ 后悔做了某事 ”。 • 【 答案 】 D • 3. After the terrible flood, the water level in the river________by 50 centimetres. • A. rises B. raises • C. is risen D. is raised • 【 解析 】 此处需用不及物动词,作“ 上升了 ” 讲。 注意句中的 by表示 “ 增减的程度 ” ,而不是表被动的 by。 • 【 答案 】 A • 4. Those who want to say anything more________your hand and then________to speak. • A. rise; raise B. raise; rise • C. raise; raise D. rise; rise • 【 答案 】 B • 5. (2020年江西卷 )I hear they’ ve promoted Tom, but he didn’ t mention________when we talked on the phone. • A. to promote B. having been promoted • C. having promoted D. to be promoted • 【 解析 】 句意为:我听说他们提拔了汤姆,但我们在电话中交谈的时候,他并没有提到已被提拔。 mention(提及 )后跟带 ing分词,且 promote与 Tom之间是动宾关系,故用被动,又因 promote的动作发生在mention之前,故用完成式,因此, B项符合语境要求。 • 【 答案 】 B • 6. —Did you fet to mention my name or fear something when you applied for an instructor? • —I meant________, but they________favourites of the people in power. • A. to have mentioned; were • B. mentioning; have been • C. to have mentioned; had been • D. to have; were • 【 解析 】 由 mean to have done 示 “ 本打算做某事 (实际上没做 )” 的省略用语只保留完成标志 have 及全句时态共同判断 D正确。 【 答案 】 D • 1. 偶尔,有时 • 2. 转过身来 • 3. 筹款 • 4. 对 „„ 感到惭愧 /羞耻 • 5. 与某人关系很好 • 6. 使 „„ 想起 from_time_to_time turn_round raise_money (be)_ashamed_of (be)_on_good_terms_with bring...to_mind • 7. 反过来,作为交换 • 8. 突然发生,突然 „„起来 • 9. (开车 )撞伤,撞死 • 10. 对 „„ 失去兴趣 • 11. 和好,和解 • 12. 保持联系 • 13. 与 „„ 失去联系 • 14. 属于 in_return burst_out knock...over lose_interest_in make_up keep_in_touch lose_touch_with belong_to • burst out突然 „„ 起来;突然说出 • (1)burst into laughter/tears/flames • 突然大笑 /放声大哭 /着火 • burst out crying/laughing突然大哭 /笑 • (2)burst in闯进来 • burst into闯入;突然 „„ 起 来 • ① She burst into tears on seeing her sister. • = She burst out crying on seeing her sister. • 看到姐姐后,她突然大哭起来。 • ② We all thought his heart would burst with happiness. • 我们都认为他心中的快乐快要爆发出来。 • ③ He burst into the room without knocking at the door. • 他没敲门就闯进房间。 • ④ That balloon will burst if you blow it up any more. • 你再给气球充气,它就会爆炸。 • keep in touch with • (1)keep/stay/be in touch (with sth.)了解某事 • get in touch with...和 „„ 取得联系 • lose touch with...和 „„ 失去联系 • (2)be in touch with...和 „„ 有联系 • be out of touch with= get out of touch with • 脱离,不了解,失去联系 • ① Wherever you go, keep in touch with me, please. • 无论你去哪里,请与我保持联络。 • ② I’ ve lost touch with most of my friends from college. • 我与大学时代的大多数朋友已经失去了联系。 • ③ It’ s years since I couldn’ t get in touch with him. • 我和他已有好几年没联系上了。 • ④ I have been out of touch with him for five years. • 我与他失去联系已有五年了。 • belong to属于,归属,为 „„ 的一员(无被动语态和进行时态形式 ) • ① These books belong to 的。 • ② China is a developing country belonging to the 3rd world. • 中国是个发展中国家,属于第三世界。 • ③ The future belongs to you, young men. • 年轻人,未来是属于你们的。 • ④ Put it back where it belongs after you have read it. • 读完后,请你把它放回原处。 • 3. (2020年重庆卷 )Professor Williams keeps telling his students that the future________to the welleducated. • A. belongs B. is belonged • C. is belonging D. will be belonged • 【 解析 】 句意为:威廉姆斯教授一直告诫他的学生们说未来是属于受过良好教育的人的。 belong to属于,此词组在使用时。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。