20xx牛津上海版一起六上unit5opendayppt课件2内容摘要:

arents __________ to the school choir at three ten in the hall. Open Day: 26 October Today: 23 October will arrive will visit will look will listen will look will have 1 2 3 4 5 6 They __________ at our projects at two thirty in the Arts and Crafts room. They __________ at the English Club noticeboard at four o’clock in the library. They __________ tea and cakes at four twentyfive in the Music room with the teachers. The parents __________ at Rose Garden School at two o’clock. They __________ our classroom at two fifteen. The parents __________ to the school choir at three ten in the hall. Open Day: 22 October Today: 23 October will arrive will visit will look will listen will look will have arrived visited looked l stened looked had Look and say 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Sat Fri Thur Wed。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。