20xx人教版高中英语必修四unit1womenofachievement2内容摘要:

rld to understand and respect the life of the chimps. Read the passage and match the main ideas of the four paragraphs. Paragraph 1: D. How our group studied chimps in the forest. Paragraph 2: C. What Jane discovered about chimps. Paragraph 3: A. What Jane have done to protect chimps. Paragraph 4: B. Jane’s achievements. D C A B Read the passage and fill in the blanks. Topic Main contents How we study the chimps in the forest (para 1) ◆ We _______ Jane’s way of studying chimps, and we visit them in the forest. ◆ We sit and wait in the shade of the trees while the family begins to wake up and ________. ◆ Then we follow as they ________ into the forest. follow move off wander Topic Main contents Daily life of chimps (para 1) ◆ They spend a lot of time _______ and cleaning each other. The mother chimps and their babies play in the trees. ◆ Chimps sleep。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。