牛津译林版高中英语选修八unit1thewrittenwordwordpower教学设计内容摘要:

name some? The teacher writes down students’ answers on the blackboard. 2. Introduce the different categories of literature by asking them to read the introduction on their book and at the same time finish a chart. Category of literature Description Fiction Category of literature Description Nonfiction Step 2 Further learning: writers of different types of literature 1. Ask students to do the following blank filling exercise。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。