25万吨聚丙烯项目施工组织设计内容摘要:
SECCO Polypylene EPC Project 9《锅炉压力容器安全监察暂行条例》实施细则、劳锅字(1992)1 号,劳部发(1995)264号关于修改《锅炉压力容器安全监察暂行条例》实施细则个别条文的通知Detailed rules and regulations of “Interim Regulations for Safety Surveillance of Boilers and Heat Exchangers” LAOGUOZI (1992) and amendments thereof LAOBUFA(1995) 《锅炉压力容器、压力管道焊工考试与管理规则》国质检锅(2020)109 号“Qualification and Management Rules for Welders of Boilers, Pressure Vessels and Pipes” GUOZHIJIANGUO (2020) 《石油化工设备安装工程质量检验评定标准》SH35142020“Quality Inspection and Evaluation Standard for Installation of Petrochemical Equipment”《压缩机、风机、泵安装工程及验收规范》GB502751998 “Quality Inspection and Evaluation Standard for Installation of Compressors, Fans and Pumps” 《机械设备安装工程施工及验收通用规范》GB502311998“General Specification for Construction and Acceptance of Installation of Mechanic Equipment”《大型设备吊装工程施工工艺标准》SHJ51590“Construction Process Standard for Lifting of Large Equipment”《化工工程建设起重施工规范》HGJ20183“Construction Procedures for Lifting Operations of Chemical Projects”《起重设备安装工程施工及验收规范》GB502781998“Construction and Acceptance specification for Installation of Lifting Equipment”《钢制焊接常压容器》JB/T473597“Atmospheric Welded Steel Vessels”《化学工业炉结构安装技术条件》 HG2054492“Technical Conditions for Installation of Chemical Furnace Structures”《工业金属管道工程施工及验收规范》GB5023597“Construction and Acceptance Specification for Industrial Metal Pipe Works”《石油化工剧毒、可燃介质管道工程施工及验收规范》SH35012020“Construction and Acceptance Specification for Petrochemical Metal Pipes Containing Extremely Toxic and Combustible Medium” 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 10《石油化工钢制管道工程施工工艺标准》SH/T35172020“Construction Process Standard for Petrochemical Steel Pipes”《现场设备、工业管道焊接工程施工及验收规范》GB5023698“Construction and Acceptance Specification for WeldiIng of Field Equipment and Industrial Pipes”《石油化工异种钢焊接规程》SH352692“Petrochemical Dissimilar Steels Welding Procedures”《石油化工工程铬钼耐热钢管道焊接技术规程》SH3 5201991“Technical Procedures for Welding of Petrochemical Heatresistant CrMo Steel Pipes”《石油化工筑炉工程施工及验收规范》SH35342020“Construction and Acceptance Specification for Petrochemical Furnaces Buildup” 《石油化工工程高温管道焊接规程》SH352392“Petrochemical High Temperature Pipes Welding Procedures”《高压电气施工及验收规范》GBJ14793“High Voltage Electrical Construction and Acceptance Specification”《接地装置施工及验收规范》GB5016992“Grounding Devices Construction and Acceptance Specification”《电缆线路施工及规范》GB5016892“Cable Lines Construction and Specification”《旋转电机施工及验收规范》GB5017092“Rotating Motors Construction and Acceptance Specification”《低压电气施工及验收规范》 GB5025496“Low Voltage Electrical Construction and Acceptance Specification”《爆炸和火灾危险环境电气装置施工及验收规范》GB5025796“Construction and Acceptance Specification for Electric Installations in the Environment with Explosion and Fire Hazards”《1kv 及地下配线工程施工及验收规范》GB5025896“Construction and Acceptance Specification for 1kv and Underground Wiring Works”《电气设备交接验收标准》GB5015091 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 11“Electrical Equipment Handover and Acceptance Standard”《电业安全工作规程》DL40891“Electrical Industry Safe Work Procedures”《石油化工仪表工程施工技术规程》SH352199“Technical Procedures for Construction of Petrochemical Instruments”《石油化工设备和管道涂料防腐蚀技术规范》SH3002299“Technical Specification for Coating Petrochemical Equipment and Pipes to Prevent Corrosion”《工业设备、管道防腐蚀工程施工及验收规范》HGJ22991“Construction and Acceptance Specification for Corrosion Protection of Petrochemical Equipment and Pipes” 《建筑防腐蚀工程施工及验收规范》GB5021291“Construction and Acceptance Specification for Corrosion Protection of Buildings” 《通风与空调工程施工及验收规范》GB502432020“Construction and Acceptance Specification for Ventilation and Airconditioning Units”《石油化工工程建设交工技术文件规定》SH35032020“Technical Documents Specification for Handover in Petrochemical Construction”《建筑桩基技术规范》JGJ9494“Technical Specification for Building Piped Foundations”《地基处理技术规范》DBJ084094“Technical Specification for Base Soil Treatment”《工程测量规范》GB5002693“Engineering Measurement Specification”《钢筋混凝土构造柱抗震技术规范》JGJ/T1394“Technical Specification for ldismic Protection of Reinforced Structural Columns”《地基与基础工程施工及验收规范》GB502022020“Construction and Acceptance Specification for Base Soil and Foundations Works”《钢结构工程施工质量验收规范》GB502052020“Steel Structures Construction Quality Inspection Code” 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 12《钢结构高强度螺栓连接的设计、施工及验收规程》JGJ8291“Design, Construction and Acceptance Procedures for High Strength Bolted Connections of Steel Structures”《轻钢龙骨隔墙吊顶工程设计施工及验收规范》DBJ0821095“Design, Construction and Acceptance Procedures for Light Steel Joist Partitions and Ceiling”《外墙涂料工程应用技术规程》DG/TJ085042020“Technical Procedures for Application of Coating Materials on External Walls”《混凝土结构工程施工及验收规范》GB502042020“Construction and Acceptance Specification for Concrete Structure Works”《混凝土泵送施工技术规程》JGJ/T1095“Technical Procedures for Concrete Pumping in Construction” 《砌体工程施工及验收规范》GB/T503152020 “Masonry Construction and Acceptance Specification”《建筑地面工程施工及验收规范》GB502092020 “Construction and Acceptance Specification for Building Ground Works” 《屋面工程技术规范》GB502072020“Technical Specification for Roofs”《钢筋焊接及验收规范》JGJ1896“Bars WeldIng and Acceptance Code”《组合钢模板技术规范》GBJ502142020《建筑装饰装修工程施工及验收规范》GB502102020“Construction and Acceptance Specification for BuildIngs Decorations”《建筑工程施工质量验收统一标准》GB503002020“General Standard for Construction Quality Inspection of BuildIng Works”《建筑施工高处作业安全技术规范》JGJ8091“Technical Specification for Safe Operations at High Altitude in BuildIng Cons。25万吨聚丙烯项目施工组织设计
相关推荐
43 .................................................................................................... 145 DF3382备自投可能出现的问题及应急解决办法 ....................................... 145 、程序 ...................
经济类型 1 国有经济 2 集体经济 3 私营经济 4 有限责任公司 5 联营经济 6 股份合作 7 外商投资 8 港澳台投资 9 其它经济 所在行业 A 农、林、牧、渔业 B 采掘业 C 制造业 D 电力、煤气及水的生成I 金融保险业 J 房地产业 K 社会服务业 L 卫生、体育和社会福利 20 和供应业 E 建筑业 F 地质勘查业、水利管理业 G 交通运输仓储业及邮电通信业 H
应急情况的处理方法。 15 ,使广大职工掌握灭火器材、设备的使用方法和自救、互救、人员疏散的技能。 安全疏散设施管理制度 一、单位应明确消防安全疏散设施的责任部门及责任人。 二、保持疏散通道、安全出口畅通,严禁占用疏散通道,严禁在安全出口或疏散通道上安装栅栏等影响疏散的障碍物。 三、应按规范设置符合国家规定的消防安全疏散指示标志和应急照明设施。 在各楼层明显位置应设置安全疏散指示图
和测厚工作。 ( 2) 在高低压系统之间应安设止逆阀等安全措施。 在有火灾爆炸危险的生产过程及 设备,应安装必要的自控监测仪表、自动调节报警装置、自动和手动泄压排放设施。 ( 3) 所有放空管均应引至室外,并高出厂房建筑物、构筑物 2米以上。 若设在露天设备区内的放空管,应高于附近有人操作的最高设备 2 米以上。 ( 4) 可燃气体的放空管,应设置安全水封或阻火器;应有向管内加氮气或蒸汽的措施
4 保安人员职责 一、按照本单位的管理规定进行防火巡查,并做好记录,发现问题应及时报告。 二、发现火灾应及时报火警并报告主管人员,实施灭火和应急疏散预案,协助灭火救援。 三、劝阻和制止违反消防法规和消防安全管理制度的行为。 15 电气焊工、电工、易燃易爆化学物品操作人员职责 一、执行有关消防安全制度和操作规程,履行审批手续。 二、落实相应作业现场的消防安全措施,保障消防安全。 三