25万吨聚丙烯项目施工组织设计内容摘要:

SECCO Polypylene EPC Project 9《锅炉压力容器安全监察暂行条例》实施细则、劳锅字(1992)1 号,劳部发(1995)264号关于修改《锅炉压力容器安全监察暂行条例》实施细则个别条文的通知Detailed rules and regulations of “Interim Regulations for Safety Surveillance of Boilers and Heat Exchangers” LAOGUOZI (1992) and amendments thereof LAOBUFA(1995) 《锅炉压力容器、压力管道焊工考试与管理规则》国质检锅(2020)109 号“Qualification and Management Rules for Welders of Boilers, Pressure Vessels and Pipes” GUOZHIJIANGUO (2020) 《石油化工设备安装工程质量检验评定标准》SH35142020“Quality Inspection and Evaluation Standard for Installation of Petrochemical Equipment”《压缩机、风机、泵安装工程及验收规范》GB502751998 “Quality Inspection and Evaluation Standard for Installation of Compressors, Fans and Pumps” 《机械设备安装工程施工及验收通用规范》GB502311998“General Specification for Construction and Acceptance of Installation of Mechanic Equipment”《大型设备吊装工程施工工艺标准》SHJ51590“Construction Process Standard for Lifting of Large Equipment”《化工工程建设起重施工规范》HGJ20183“Construction Procedures for Lifting Operations of Chemical Projects”《起重设备安装工程施工及验收规范》GB502781998“Construction and Acceptance specification for Installation of Lifting Equipment”《钢制焊接常压容器》JB/T473597“Atmospheric Welded Steel Vessels”《化学工业炉结构安装技术条件》 HG2054492“Technical Conditions for Installation of Chemical Furnace Structures”《工业金属管道工程施工及验收规范》GB5023597“Construction and Acceptance Specification for Industrial Metal Pipe Works”《石油化工剧毒、可燃介质管道工程施工及验收规范》SH35012020“Construction and Acceptance Specification for Petrochemical Metal Pipes Containing Extremely Toxic and Combustible Medium” 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 10《石油化工钢制管道工程施工工艺标准》SH/T35172020“Construction Process Standard for Petrochemical Steel Pipes”《现场设备、工业管道焊接工程施工及验收规范》GB5023698“Construction and Acceptance Specification for WeldiIng of Field Equipment and Industrial Pipes”《石油化工异种钢焊接规程》SH352692“Petrochemical Dissimilar Steels Welding Procedures”《石油化工工程铬钼耐热钢管道焊接技术规程》SH3 5201991“Technical Procedures for Welding of Petrochemical Heatresistant CrMo Steel Pipes”《石油化工筑炉工程施工及验收规范》SH35342020“Construction and Acceptance Specification for Petrochemical Furnaces Buildup” 《石油化工工程高温管道焊接规程》SH352392“Petrochemical High Temperature Pipes Welding Procedures”《高压电气施工及验收规范》GBJ14793“High Voltage Electrical Construction and Acceptance Specification”《接地装置施工及验收规范》GB5016992“Grounding Devices Construction and Acceptance Specification”《电缆线路施工及规范》GB5016892“Cable Lines Construction and Specification”《旋转电机施工及验收规范》GB5017092“Rotating Motors Construction and Acceptance Specification”《低压电气施工及验收规范》 GB5025496“Low Voltage Electrical Construction and Acceptance Specification”《爆炸和火灾危险环境电气装置施工及验收规范》GB5025796“Construction and Acceptance Specification for Electric Installations in the Environment with Explosion and Fire Hazards”《1kv 及地下配线工程施工及验收规范》GB5025896“Construction and Acceptance Specification for 1kv and Underground Wiring Works”《电气设备交接验收标准》GB5015091 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 11“Electrical Equipment Handover and Acceptance Standard”《电业安全工作规程》DL40891“Electrical Industry Safe Work Procedures”《石油化工仪表工程施工技术规程》SH352199“Technical Procedures for Construction of Petrochemical Instruments”《石油化工设备和管道涂料防腐蚀技术规范》SH3002299“Technical Specification for Coating Petrochemical Equipment and Pipes to Prevent Corrosion”《工业设备、管道防腐蚀工程施工及验收规范》HGJ22991“Construction and Acceptance Specification for Corrosion Protection of Petrochemical Equipment and Pipes” 《建筑防腐蚀工程施工及验收规范》GB5021291“Construction and Acceptance Specification for Corrosion Protection of Buildings” 《通风与空调工程施工及验收规范》GB502432020“Construction and Acceptance Specification for Ventilation and Airconditioning Units”《石油化工工程建设交工技术文件规定》SH35032020“Technical Documents Specification for Handover in Petrochemical Construction”《建筑桩基技术规范》JGJ9494“Technical Specification for Building Piped Foundations”《地基处理技术规范》DBJ084094“Technical Specification for Base Soil Treatment”《工程测量规范》GB5002693“Engineering Measurement Specification”《钢筋混凝土构造柱抗震技术规范》JGJ/T1394“Technical Specification for ldismic Protection of Reinforced Structural Columns”《地基与基础工程施工及验收规范》GB502022020“Construction and Acceptance Specification for Base Soil and Foundations Works”《钢结构工程施工质量验收规范》GB502052020“Steel Structures Construction Quality Inspection Code” 上海赛科聚丙烯项目_ SECCO Polypylene EPC Project 12《钢结构高强度螺栓连接的设计、施工及验收规程》JGJ8291“Design, Construction and Acceptance Procedures for High Strength Bolted Connections of Steel Structures”《轻钢龙骨隔墙吊顶工程设计施工及验收规范》DBJ0821095“Design, Construction and Acceptance Procedures for Light Steel Joist Partitions and Ceiling”《外墙涂料工程应用技术规程》DG/TJ085042020“Technical Procedures for Application of Coating Materials on External Walls”《混凝土结构工程施工及验收规范》GB502042020“Construction and Acceptance Specification for Concrete Structure Works”《混凝土泵送施工技术规程》JGJ/T1095“Technical Procedures for Concrete Pumping in Construction” 《砌体工程施工及验收规范》GB/T503152020 “Masonry Construction and Acceptance Specification”《建筑地面工程施工及验收规范》GB502092020 “Construction and Acceptance Specification for Building Ground Works” 《屋面工程技术规范》GB502072020“Technical Specification for Roofs”《钢筋焊接及验收规范》JGJ1896“Bars WeldIng and Acceptance Code”《组合钢模板技术规范》GBJ502142020《建筑装饰装修工程施工及验收规范》GB502102020“Construction and Acceptance Specification for BuildIngs Decorations”《建筑工程施工质量验收统一标准》GB503002020“General Standard for Construction Quality Inspection of BuildIng Works”《建筑施工高处作业安全技术规范》JGJ8091“Technical Specification for Safe Operations at High Altitude in BuildIng Cons。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。