英语必修5外研版module4方案一精品教案6内容摘要:
aulieu of the University of Notre Dame and the . Environmental Protection Agency in Cincinnati, Ohio, and lead author of the paper published this week in the journal Proceedings of the National Academy of Sciences. “Much of this nitrogen is transported into river and stream works,” Beaulieu said. There, microbes (微生物 ) convert the nitrogen into nitrous oxide (also called laughing gas) and an inert gas called dinitrogen (二氮 ). The finding is important, the researchers say, because nitrous oxide is a powerful greenhouse gas that contributes to climate change and destruction of the stratosphere’s ozone layer, which protects us from the sun’s harmful ultraviolet (紫外线 ) radiation. Compared with carbon dioxide, nitrous oxide is 300fold more powerful in terms of its warming potential, though car。英语必修5外研版module4方案一精品教案6
相关推荐
1、知识网络 自我构建 海陆间循环 北印度洋季风环流 气候一 二核心归纳 思维深化一、位、含沙量、有无结冰期、流速等。 (1)流量 :指单位时间内水流流过某一过水断面的体积 ,用立方米 /秒来表示。 对河流流量曲线图的阅读 ,一般是看河流流量曲线 ,通过对河流流量曲线的判读可以分析出河流的下列水文特征。 一 二一 二 河流的流量 :各月的流量之和即为该河的全年流量。
1、第一章 论述类文本阅读三年考点列阵 适用于全国卷 年份 选篇出处 题材题型及分值 考点分布2015 宋代信用的特点与影响 社会经济学选择,3题 9分 筛选并整合文中信息; 归纳内容要点并分析概括作者在文中的观点态度。 2014 美的奥秘 美学选择,3题 9分 理解文中重要概念的含义 ; 筛选并整合文中信息; 归纳内容要点并分析概括作者在文中的观点态度。 2013 老子 的年代 文化选择,3题
r and further away from the whalers. (6)______knew that Old Tom would protect James. Suggested answers: (1)Clancy (2)Gee (3)Old Tom (4)Jack (5)James (6)Red Step 4 Scanning 1. Read these two anecdotes
说说常见的固体、液体、气体密度大小规律 , ( 4)物质的密度是不是恒定不变,哪些因素会影响物质密度的大小。 【当堂反馈】 比较铁和塑料时,可以取相同 _________的铁和塑料,比较它们的 _______的大小, _______小的是塑料。 同种物质的密度 __________,不同种物质的密度一般 ___________。 __________________________叫密度
度一般。 水的密度ρ = Kg/m3,其物理意义是_________________________________________。 教案: 精讲点拨,体验探究 【例 1】体积是 40cm3的铁块,质量为 316g,铁的密度是 ____g/cm3。 若锯去一半,所剩下一半铁的密度是 _____g/cm3。 【例 2】一个体积为 30cm3的铜球,质量为 178g,这个铜球是实心球还是空心球。