高中英语unit5meetingyourancestorslistening练习新人教版选修8内容摘要:

It makes you realize how _________ Emperor Qin Shihuang was. ZL: Yes, indeed. And each of them has an individual _____ so that archaeologists think they must have been a _____ of Qin Shihuang’s real army. But _____ thousand statues are a lot of clay figures to _______ and there have been problems. AP: Oh dear! What problems? ZL: Well, the first problem is how to keep their _______. Chinese archaeologists _____ discovered that the statues were painted before they were ______. But temperature changed and _______ soon faded the colours after the statues were __________. AP: _____ did that happen? ZL: First, some of them became a little bit _______ when they dried out after being excavated and that made their colour disappear _______. Second, the damp in the tomb also _______ the colours badly. But now _______ the scientists have discovered a new ________ protection, which will keep the colours ________ brightly. AP: That’s wond erful _______. ZL: Yes. It’s a very thin layer of chemical jelly which will preserve the _____ colours of the soldiers as well as protect them _______ the damp. AP: That’s great. So the problem’s _______. But I39。 m afraid that those statues that lost their colour can’t get it ______? ZL: Sadly, no. But this breakthrough has helped deal with ________ problem. AP: What39。 s that? ZL: Well, you know that the terracotta warriors were discovered in。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。