高中英语module2nodrugs不定式作状语练习外研版必修2内容摘要:

d. A. learn B. to learn C. learned D. learning 答案: B. make后接不带 to 的动词不定 式,当其用于被动时, to 不可省略。 动词不定式的否定式 Tell him not to shut the window… She pretended not to see me when I passed by. 我走过的时候,她 假装没看见。 典型例题 1) Tell him ___ the window. A. to shut not B. not to shut C. to not shut D. not shut 答案: B。 tell sb to do sth 的否定形式为 tell sb not to do sth. 2) She pretended ___ me when I passed by. A. not to see B. not seeing C. to not see D. having not seen 答案: A。 pretend 后应接不定式。 其否定形式为 pretend not to do sth.。 3) Mrs. Smith warned her daughter ___ after drinking. A. never to drive B. to never driver C. never driving D. never drive 答案: A。 warn。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。