鲁教版英语八下unit1haveyoueverbeentoanamusementpark13内容摘要:

let’ s go and ask him. 如: How will we get there? I went there on our last school trip/last year. Me, neither. / Neither of I. I have ever been to „ He/She has ever been to„ He/She has never been to„ 下面请看一幅中国的地图,谈论一下你曾经去过什么地方,你想去哪。 你将怎 么去那。 Sample three: (P69 2c) name Where you have been Where you want to go How you are going to get there[ 下面由老师讲解一下本文中出现的一些 短语,供大家参考。 neither (1) Neither Jenny nor I own a car. (2) Leon neither drinks nor smokes (3) My husband doesn’ t want to see a movie toni ght, and neither do I. (4) A: Which of the dresses did you like? B: Neither of them. instead 和 instead of (1) I’ d like to go to the movies instead o。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。