鲁教版英语九年unit4whenwasitinvented5内容摘要:

_ by the nurse. A. were looked B. looked after C. were looked after D. looked lab ____ about five years ago. A. was builded B. was built C. builds D. has been built glass ______ . It _____ by little Tom this morning. A. broke, is broken B. is broken, was broken C. was broken, broke D. has been broken, broken ______the way to the railway station by a policeman. A. was shown B. showed C. have shown D. was showing When water______ , it will be changed into vapour. A. is heated B. heating C. has heated D. heats can39。 t enter the room because its door______ . A. locked B. locks C. is locked D. is locking ______day and night. A. are made work B. are made to work。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。