高中英语module4fineartswesternchineseandpop动名词或动词不定式作宾语的动词练习外研版必修2内容摘要:

door. I have tried to make friends with him, but he seems not to care. 4. mean doing sth 表示“意味着做某事”,而 mean to do sth 表示“打算做某事”。 To raise wage means increasing purchasing power. I didn’t mean to hurt yo ur feelings that day. 5. regret doing sth 指“后悔做过某事”,而 regret to do sth表示“遗憾要做某事”。 He regretted missing the chance of going abroad. I regret to say I can’t ac cept your gift. 6. stop doing sth 表示“停止做某事”, stop to do sth 表示“停止做正在做的事以便去做另外一件事”。 Please stop talking. As he was busy that day, he didn’t stop to talk with me. 【注意】 need, require, want 等动词作“需要”解时,其后既可用 ing形式的主动式 (表示被动意义 ),也可用不定式的被动式作宾语。 例如: The window needs cleaning/to be cleaned. Those young trees require looking。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。