配套中学教材全解工具版—module3theviolenceofnature话题功能集锦外研版必修3内容摘要:
5. The entire town drowned in the tsunami./ The town was covered with water in the tsunami./ The sea water spread over the town in the tsunami. 整个小镇都被海啸淹没了。 6. Heavy rainfalls inundated the crops. / The flood overflowed the crops./ The crops were covered with heavy。 7. Soil and water loss is the trouble root of the natural disaster in Jiangxi Province. / Soil and water loss has led to the natural disaster in Jiangxi Province./ The natural dis。配套中学教材全解工具版—module3theviolenceofnature话题功能集锦外研版必修3
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。