牛津译林版高中英语必修二unit2wishyouwereheretask教学设计内容摘要:

pril To honour the dead „ „ „ „ a place. B: Brainstorming Get students to think what else is necessary besides the names of the places if one plans to travel. Collect answers from the students. ( suggested answers: departure time, cost, activities, duration, means of travelling, etc. ) C: Let students read the two leaflets once again and fill in the blanks in Part B on P34. Tell them they won’ t be able to finish the task once in all. D: Ask students to summarize what information is left unsolved. Have them listen to the tape and fill in all the details. [Explanation] 在简单的在“找地名”环节后,通过问题设计从学生中获得更多与旅游( travel)有关的内容,如旅游花费、旅游方式、持。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。