牛津沪教三上module1unit1hereiam内容摘要:

e and introduce oneself each other. E. Open the book and look at the picture (P. 2). Then say about the picture in pairs. . I’m Miss Fang. I’m Alice. I’m Peter. … Consolidation : A. To stick the pictures on the board. Puppy Kitten Duckling B. Say about the pictures in pairs. . Hello! I’m Puppy. … : Sing a song and say the sentences with the children’s parents. 课 后 随 笔 成功与经验 板书设计 参见教案中的板书。 思考与对策 Period Two Teaching contents: Look and say (P. 3) Teaching Aims: 1.知识目标: Learning the capital letters: AZ。 Learning the small letters: Az 2.能力目标: Can recognize, read and copy the letters. Difficult and key points: The letters Teaching aids: Pictures, The Alphabet Cards. Teaching procedure: 教学步骤 方法与手段 补充与修 改 Mr White Panda Dotty。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。