开心学英语五上unit1comewithme(4)内容摘要:
e’s a factory worker.] T: Put a checkmark in the box for picture 2. ( 6) Repeat the procedures with the other three questions. (Practice 2) ( 1) Have Ss look at the questions on the page. ( 2) Ask S1 to read the first question. [S1: What does your mom do?] T: My mom’s a (teacher). (S2’s name), ask (S3’s name) the second question. [S2: What do you want to be?] [S3: I want to be a doctor.] ( 3) Let the Ss write the answers on the top row. ( 4) Ask the first question and have Ss write their answers. ( 5) Do the same with the second question. ( 6) Walk around the classroom to help Ss if needed. (。开心学英语五上unit1comewithme(4)
相关推荐
2、:“州以事上转运使,转运使择其吏之能者行视可否,凡三反复,而又上于朝廷,决之三司,然后曰可,而皆不能易吾侯之议也。 ”曰:“此君子之作也,可以书矣。 ”盖虑于民也深,则谋其始也精,故能用力少而为功多。 夫以百步之堤,御天下至险不测之虞,惠其民而及于荆、潭、黔、蜀,凡往来湖中,无远迩之人皆蒙其利焉。 且岳阳四会之冲,舟之来而止者,日凡有几。 使堤土石幸久不朽,则滕侯之惠利于人物,可以数计哉。
2、十,如五六十(或者)【解析】如:或者。 【答案】列句中加点词的活用类型与例句相同的一项是()例句:风乎舞雩A曾皙后B比及三年,可使足民C比及三年,可使有勇,且知方也D赤也为之小,孰能为之大【解析】例句是名词作动词,吹风、乘凉。 A 项是名词作动词,落在后面。 B 项是形容词的使动用法,使富足。 C 项是形容词作名词,勇气。 D 项是形容词作名词,小事。
2、 D /【解析】是名词作状语/为名词作动词。 【答案】列句中加点的词是古今异义的一项是()A内外多置小门墙,往往而是B余稍为修葺,使不上漏C今已亭亭如盖矣D余久卧病无聊【解析】往往:古义,到处;今义,副词,表示根据以往的经验,某种情况在一定条件下时常存在或经常发生。 【答案】列对原文有关内容的分析和概括,不正确的一项是()A “庭中始为篱,已为墙,凡再变矣。 ”由“篱”到“墙”
hat’ the question? [S2: What did you do last night?] 7. T: (S3’s name), what’s the answer? [ S3: I studied English.] 8. Continue with the rest of the questions. (2) Getting ready 1. Go over Picture
to the tape about the conversation twice. T: What’re Gogo and Jenny talking about? Play the tape and have the students follow by looking at the page and repeat. Put the students into pairs to
2、然已,勿动勿虑C不抑耗其实而已 D若不过焉则不及【解析】“而已”古今都当“罢了”讲。 A 项,古义:两个词, “所以乡里” ;今义:出生或长期居住过的地方。 家乡,老家。 B 项,古义:已经这样;今义:连词,表示先提出前提,而后加以推论。 D 项,古义:不是过多;今义:连词,表转折,跟“只是”相同。