开心学英语五上unit12review3内容摘要:

hat’ the question? [S2: What did you do last night?] 7. T: (S3’s name), what’s the answer? [ S3: I studied English.] 8. Continue with the rest of the questions. (2) Getting ready 1. Go over Picture Cards 5376 on the page orally. 2. Point to the pictures at random and have Ss describe it by picking the correct card and say a sentence/a phrase, . (With the card watched.) He watched TV. Using the book T。 now I’ll play the tape. Listen to the conversation. Play the tape for A and pause. T: Which is the correct picture? Put a checkmark in the correct box. Continue with the rest. Play the tape again and check the answers with the whole class. (3) Getting ready。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。