开心学英语三下unit9whattimeisit(第一课时)内容摘要:

as you and the Ss say the hours of the day. G. T: (Pointing to the 1 on a clock.) What time is it? Ss: It’s one o’clock. Model if necessary. 2) Using the book A. T: (Point a watch or a clock.) What’s this? Ss: It’s a watch / clock. B. Listen to the tape and have Ss repeat after each sentence. C. Play the tape again and have Ss follow along. D. T: Get into groups of three. One plays Gogo, one plays Tony and one plays the shopkeeper. Point out who the shopkeeper is in the picture. E. Have Ss listen and speak their roles as the tape plays. 2. Vo。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。