60道包含therebe句型考点题内容摘要:

are ( ) 25. There a map between the two windows. A. is B. are C. will be D. was ( ) 26. There a box of oranges in the room. A. is B. are C. have D. has ( ) 27. If there a “ No Swimming” sign, don’ t get into water. A. are B. have C. were D. is ( ) 28. There a lot of people over there. Do you know what has happened? A. are B. was C. have D. is ( ) 29. There are a few differences between them, ? A. are there B. are they C. aren’ t they D. aren’ t there ( ) 30. There something new in tomorrow’ s newspaper. A. is going to have B. is going to be C. are going to have D. are going to be ( ) 31. Beijing rainy. And there much wind, too. A. will have, will have B. will be, will have C. will be, will be D. will have, will be ( ) 32. How many are there in your family? A. peoples B. the people C. people D. some people ( ) 33. The radio says a cold day in South China tomorrow. A. will be B. will have C. will get D. there will be ( ) 34. There is little water in the bottle, ? A. isn’ t there B. is there C. are there D. is they ( ) 35. There are few apples in the fridge, ? A. are there B. aren’ t there C. aren’ t they D.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。