20xx蓟县二模录音稿及答案(1)内容摘要:
: I hope it’s his. He was very upset when he lost it. C) 听下面长对话或独白,每段长对话或独白后都有几个问题,从题中所给的 A、 B、 C三个选项中选择最佳选项。 听下面一段对话,回答第 15 第 18 小题 W: Where have you been, Harry? M: I have been to the library with Wilson and Steven. I wanted to borrow some books to read during the vacation. W: The school is so quiet today. M: Yes, a lot of students have gone home. Do you have any plans? W: I’m going home to see my parents. What about you? M: I’m not going anywhere. I have decided to save my money for a trip to Australia next year. 听下面一段材料,回答第 18 至第 20题 My name is David. I’m having a birthday party next Sunday. I will be sixteen years old. I don’t like to eat in the restaurant, because there are too many people there. Mum and Dad have agreed to let me have it at home, while they’re away to visit my uncle. I’m going to wear a new Tshirt with my favorite singer’s photo on it. I’m sure it can make me loo。20xx蓟县二模录音稿及答案(1)
相关推荐
. It is nice to have a friend to talk, laugh and do things with. Surely, there are times when we need to be alone. We don39。 t always want people around. But we would feel lonely if we never had a
, people in the town of Bunol throw tomatoes at each other. Don’t worry. It’s not a real fight. People do this only for fun. 54. APEC Blue refers to _____ in Beijing during the APEC meeting. A. the
1、超越集团煤炭事业部薪酬制度超越集团二零零一年十一月超越集团煤炭事业部薪酬制度1第一章 总 则第一条 薪酬是对员工为超越所做出的贡献和付出的努力的补偿,同时充分考虑工作性质、员工的学历、技能与经验,以达到吸引人才,激励、留住人才的目的。 第二条 薪酬制度的设计体现公平性、竞争性和激励性原则。 1、公平性原则:薪酬以体现工资的外部公平、内部公平和个人公平为导向,在确定员工薪酬时以岗位特点
1、超越集团年薪制薪酬制度超越集团二零零一年十一月超越集团年薪制薪酬制度1超越集团年薪制薪酬制度第一条 年薪薪酬是对集团主要经营者所做出的贡献和付出的努力的补偿,同时充分考虑职业经理人的个人价值和年度经营业绩。 第二条 本制度的适用范围是集团总裁、总监、集团公司总经理、煤炭事业部总经理、超市总经理、煤矿矿长等。 第三条 实行年薪制的岗位应是工作业绩能够按一年的完整经营周期进行评估。 第四条
1、超越集团煤炭事业部考核制度超越集团二零零一年十一月超越集团煤炭事业部考核制度1第一章 总则第一条 适用范围本制度适用于煤炭事业部除总经理和矿长外的全体员工。 第二条 考核目的通过考核激励员工围绕事业部季度和年度经营业绩积极努力开展工作,为员工季度奖金和年度奖金的发放提供依据,同时为员工工作改进和工作重点指明方向。 第三条 考核原则(一) 务实适用原则。 (二) 效益导向与职责导向结合原则。
成一位 ,两位 , 三位 „„ 的小数; , 百分之一 , 千分之一等。 小数与整数的相同点: 10; , 都要从高位写起。 小数的性质 : 小数的末尾添上 0或去掉 0,小数 的大小不变。 比较小数大小的方法 : 先看整数部分 , 整