普华永道—财务运营最佳实践2内容摘要:
To To in To a of To to of of to 4 on up to on to by eg of R L on a of of on No O as of of to OP R OP to R L to to DI on of to to of to o R by or 0 0 of 0,300 5,500 700 or 0 0 1 3 18 0 0 1 to of R of of of of in of of 0 0。普华永道—财务运营最佳实践2
相关推荐
s of of of of of on of to of to of to on of on a by to on a 2 of of on a to of to by a of be to on a of on to of of of 3 of of of of in of as a of of of of of Number
1、中国石油塔里木油田公司PetroChina Tarim Oilfield Company人力资源规划 2005一2020年支撑报告四-2塔西南调查问卷统计分析报告北大纵横塔里木项目组二零零五年五月 油密AAA级人1(0年说明 口 ”北大纵横塔里木项目组在第一阶段访谈的基础上,为了进一步全面、深入了解塔西南公司的 人力资源管理现状及员工的评价和建议等一系列重 特编制下发了本次调查问卷。 口
) To To to To To To To of to of of ) up of to O on of is ) of to DI of of to of to on of to to ) of of of of of Os of of of 6 0 9 0 0 of TE 5,000 7,000 3,000 or 0 0 2 6 17 10 in 1 997 6 ) o P by by
呢。 学生按要求独立进行计算。 交流: 3让同学们自己去解决,谁来说说用乘法竖式计算的过程 ?指名板书。 观察并猜测:黑板上两题中因数的小数位数与积的小数位数有什么联系。 是不是所有的小数乘整数,情况都一样。 三、教学“试一试”归纳计算方法。 出示 12, 5 3, 103 ,用计算器验证。 讨论:通过刚才的计算和比较,你得出什么结论。 小结:计算小数乘整数时,一般可以先按整数乘法算